Basement finish guide Basement Guide www douglas co us FINISHED BASEMENT REQUIREMENT GUIDE Current Codes International Residential Code International Energy Conservation Code National Electrical Code I-Code Resolution No R- - Douglas County Building Polic
Basement Guide www douglas co us FINISHED BASEMENT REQUIREMENT GUIDE Current Codes International Residential Code International Energy Conservation Code National Electrical Code I-Code Resolution No R- - Douglas County Building Policy Manual Table of Contents Sample of Drawing Requirements Sequence of Inspections General Building Requirements Egress Requirements Wall Construction Floor Ceiling Construction Mechanical Requirements Plumbing Requirements Electrical Requirements Helpful Hint You may obtain permits in your own name however if a contractor is to perform the work the contractor shall obtain the permit and be listed as the responsible party In this way Douglas County will be in a better position to assist you in gaining compliance with codes if the work is defective A contractor shall be properly registered and insured in order to obtain a permit Douglas County Building Division Third Street Suite Castle Rock CO Third Street ? Castle Rock Colorado ? ? Fax CSAMPLE OF DRAWNING REQUIREMENTS Plans shall be drawn to a scale of ? ? ? ? on white paper in blue or black ink and shall include room dimensions Plans shall show the location of the furnace water heater stairs and all existing windows including sizes Label the intended use of all rooms un ?nished areas and make note of the total ?nish and un ?nished square footage Please note on the drawings if you have a septic system TriCounty approval is required if you are adding a bedroom Where ?re suppression is required Fire Department review shall be required for submittal FURNACE WH CLOSET CRAWL SPACE PANELBOARD ' LABEL SPACES THAT ARE UNFINISHED SUPPLY HEIGHT OF ALL FINISHED CEILINGS S C O REC ROOM ' LABEL ALL ROOMS AND SPACES UNFINISHED ' CONCRETE S SUPPLY DIMENSIONS OF ALL EGRESS WINDOWS ' BEDROOM ' ' BATHROOM CLOSET ' ' DOE RESIDENCE FINISHED BASEMENT FINISHED SQUARE FEET UNFINISHED SQUARE FEET MOCKINGBIRD LANE PROVIDE ADDRESS AND SQUARE FOOTAGE OF FINISHED AND UNFINISHED SPACES CSEQUENCE OF INSPECTIONS This is a list of the most common inspections that are required for a typical Basement Finish Some of the listed inspections may not be applicable to your project Additional inspections may be required for other less typical projects Underground Plumbing or under oor This inspection is performed when the base plumbing drainage system is in place The inspection shall be approved prior to placement of concrete or oor sheathing The system may be on test at the time of the inspection with water or ?ve pounds of air pressure shown on a p s i gauge for systems other than plastic or a ow test may be performed at time of inspection Plastic piping shall not be tested using air All plumbing under structural oors shall be suspended a minimum of three inches above the ground to allow for soil expansion Electrical Slab Inspection This inspection is required when electrical conduits are installed under any concrete prior to placement of concrete Rough Electric This inspection is to be performed when all of the wire and boxes have been
Documents similaires
-
24
-
0
-
0
Licence et utilisation
Gratuit pour un usage personnel Attribution requise- Détails
- Publié le Oct 26, 2021
- Catégorie Creative Arts / Ar...
- Langue French
- Taille du fichier 64.5kB