OptiX RTN 600 Radio Transmission System V100R002 Installation Guide Issue 03 Da

OptiX RTN 600 Radio Transmission System V100R002 Installation Guide Issue 03 Date 2008-08-30 Part Number 00425659 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd Huawei Technologies Co., Ltd. provides customers with comprehensive technical support and service. For any assistance, please contact our local office or company headquarters. Huawei Technologies Co., Ltd. Address: Huawei Industrial Base Bantian, Longgang Shenzhen 518129 People's Republic of China Website: http://www.huawei.com Email: support@huawei.com Copyright © Huawei Technologies Co., Ltd. 2008. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of Huawei Technologies Co., Ltd. Trademarks and Permissions and other Huawei trademarks are the property of Huawei Technologies Co., Ltd. All other trademarks and trade names mentioned in this document are the property of their respective holders. Notice The information in this document is subject to change without notice. Every effort has been made in the preparation of this document to ensure accuracy of the contents, but the statements, information, and recommendations in this document do not constitute a warranty of any kind, express or implied. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd Contents About This Document.....................................................................................................................1 1 Safety Precautions......................................................................................................................1-1 2 Before You Start..........................................................................................................................2-1 2.1 Installation Flow..............................................................................................................................................2-2 2.2 Preparing Documents and Tools ....................................................................................................................2-2 2.2.1 Documents..............................................................................................................................................2-2 2.2.2 Tools.......................................................................................................................................................2-3 2.3 Checking Installation Conditions....................................................................................................................2-3 2.3.1 Checking the Installation Conditions of the IDU...................................................................................2-3 2.3.2 Checking the Installation Conditions of the ODU.................................................................................2-4 2.3.3 Checking the Lightning-Proof and Grounding System..........................................................................2-4 2.3.4 Checking the Power System...................................................................................................................2-5 2.3.5 Checking Auxiliary Devices and Cables................................................................................................2-6 2.4 Unpacking the Equipment...............................................................................................................................2-7 2.4.1 Checking the Equipment........................................................................................................................2-7 2.4.2 Unpacking Crates...................................................................................................................................2-9 2.4.3 Unpacking Cartons...............................................................................................................................2-11 2.4.4 Unpacking Boards................................................................................................................................2-12 3 Installing the IDU 605...............................................................................................................3-1 3.1 Introduction to the IDU 605............................................................................................................................3-2 3.2 Installing the IDU 605 in a Cabinet................................................................................................................3-4 3.3 Installing the IDU 605 on the Wall.................................................................................................................3-7 3.4 Installing the IDU 605 on a Desk..................................................................................................................3-10 3.5 Installing an E1 Panel....................................................................................................................................3-11 4 Installing the Cables of the IDU 605......................................................................................4-1 4.1 Installing the IDU Protection Grounding Cable..............................................................................................4-3 4.2 Installing the Protection Grounding Cable of the E1 Panel ...........................................................................4-4 4.3 Installing the Power Cable..............................................................................................................................4-5 4.4 Installing the IF Jumper...................................................................................................................................4-6 4.5 Installing the E1 Cable (from the IDU 605 to the External Equipment).........................................................4-8 4.6 Installing the E1 Cable (from the IDU 605 to the E1 Panel)..........................................................................4-9 4.7 Installing the Network Management Cable...................................................................................................4-11 OptiX RTN 600 Radio Transmission System Installation Guide Contents Issue 03 (2008-08-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd i 4.8 Installing the Orderwire Line........................................................................................................................4-12 4.9 Installing the External Alarm Cable..............................................................................................................4-13 4.10 Installing the Synchronous Data Cable.......................................................................................................4-15 4.11 Installing the Asynchronous Data Cable.....................................................................................................4-16 5 Installing the IDU 610/620........................................................................................................5-1 5.1 Introduction to the IDU 610/620.....................................................................................................................5-2 5.2 Installing the IDU in a Cabinet.......................................................................................................................5-5 5.3 Installing the IDU on the Wall......................................................................................................................5-10 5.3.1 Installing the IDU 610 That Has Wall-Mounting Holes on the Wall..................................................5-11 5.3.2 Installing the IDU 620 That Has Wall-Mounting Holes on the Wall..................................................5-13 5.3.3 Installing the IDU That Does Not Have Wall-Mounting Holes on the Wall.......................................5-16 5.4 Installing the IDU on a Desk.........................................................................................................................5-19 5.4.1 Installing the IDU 610 on a Desk.........................................................................................................5-19 5.4.2 Installing the IDU 620 on a Desk.........................................................................................................5-21 5.5 Installing an E1 Panel ...................................................................................................................................5-22 6 Installing the Cables of the IDU 610/620...............................................................................6-1 6.1 Installing the IDU Protection Grounding Cable..............................................................................................6-2 6.2 Installing the Protection Grounding Cable of the E1 Panel ...........................................................................6-2 6.3 Installing the Power Cable..............................................................................................................................6-3 6.4 Installing the IF Jumper...................................................................................................................................6-5 6.5 Installing the XPIC Cable...............................................................................................................................6-7 6.6 Installing the Service Signal Cable.................................................................................................................6-8 6.6.1 Installing the Fiber Jumper.....................................................................................................................6-8 6.6.2 Installing the STM-1e/E3/T3 Cable.....................................................................................................6-10 6.6.3 Installing the E1 Cable (from the PO1/PH1 Board to the External Equipment)..................................6-12 6.6.4 Installing the E1 Cable (from the PD1 Board to the External Equipment)..........................................6-13 6.6.5 Installing the E1 Cable (from the PO1/PH1 Board to the E1 Panel)...................................................6-14 6.6.6 Installing the Ethernet Service Network Cable....................................................................................6-16 6.7 Installing the Auxiliary Cable.......................................................................................................................6-17 6.7.1 Installing the Network Management Cable..........................................................................................6-17 6.7.2 Installing the External Clock Cable/Wayside Service Cable...............................................................6-19 6.7.3 Installing the Orderwire Line...............................................................................................................6-20 6.7.4 Installing the External Alarm Cable.....................................................................................................6-21 6.7.5 Installing the Asynchronous Data Cable..............................................................................................6-23 6.7.6 Installing the Synchronous Data Cable................................................................................................6-24 7 Installing the ODU with the Waveguide Interface............................................................. 7-1 7.1 Introduction to the ODU.................................................................................................................................7-2 7.2 Installing One ODU on One Single-Polarized Antenna (Integrated Mounting).............................................7-3 7.2.1 Installing the Antenna............................................................................................................................7-3 7.2.2 Setting the Antenna Polarization............................................................................................................7-3 7.2.3 Installing the ODU on the Antenna........................................................................................................7-5 Contents OptiX RTN 600 Radio Transmission System Installation Guide ii Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd Issue 03 (2008-08-30) 7.3 Installing Two ODUs on One Single-Polarized Antenna (Integrated Mounting)...........................................7-7 7.3.1 Installing the Antenna............................................................................................................................7-8 7.3.2 Setting the Antenna Polarization............................................................................................................7-8 7.3.3 Installing the Hybrid Coupler on the Antenna.......................................................................................7-8 7.3.4 Installing the ODU on the Hybrid Coupler..........................................................................................7-11 7.4 Installing One ODU on One Single-Polarized Antenna (Separate Mounting).............................................7-13 7.4.1 Installing the Antenna..........................................................................................................................7-14 7.4.2 Setting the Antenna Polarization..........................................................................................................7-14 7.4.3 Installing the Separate Mounting Parts................................................................................................7-14 7.4.4 Installing the ODU onto the ODU Adapter..........................................................................................7-16 7.5 Installing ODUs on One Dual-Polarized Antenna........................................................................................7-17 8 Installing the ODU with the Coaxial Interface....................................................................8-1 8.1 Introduction to the ODU.................................................................................................................................8-2 8.2 Installing One ODU on One Single-Polarized Antenna..................................................................................8-4 8.2.1 Installing the Antenna............................................................................................................................8-4 8.2.2 Setting the Antenna Polarization............................................................................................................8-4 8.2.3 Installing the ODU on a Pole.................................................................................................................8-4 8.2.4 Connecting the ODU to the Antenna.....................................................................................................8-6 8.3 Installing Two ODUs on One Single-Polarized Antenna...............................................................................8-9 8.3.1 Installing the Antenna............................................................................................................................8-9 8.3.2 Setting the Antenna Polarization............................................................................................................8-9 8.3.3 Installing the ODUs on a Pole................................................................................................................8-9 8.3.4 Connecting the ODUs to the Antenna....................................................................................................8-9 8.4 Installing ODUs on One Dual-Polarized Antenna........................................................................................8-12 9 Installing ODU Cables..............................................................................................................9-1 9.1 Installing the ODU Protection Grounding Cable............................................................................................9-2 9.2 Installing the Lightning Arrestor.....................................................................................................................9-3 9.3 Installing the IF Cable.....................................................................................................................................9-6 9.4 Routing and Bundling the IF Cable...............................................................................................................9-10 9.5 Grounding the IF Cable.................................................................................................................................9-10 9.5.1 Grounding Points of the IF Cable........................................................................................................9-10 9.5.2 Grounding the IF Cable........................................................................................................................9-13 9.5.3 Installing the Grounding Clip...............................................................................................................9-14 10 Checking the Installation.....................................................................................................10-1 10.1 Checking the Installation of the IDU..........................................................................................................10-2 10.2 Checking the Installation of the ODU.........................................................................................................10-5 A Terminating the IF Cable with Connectors........................................................................A-1 B Waterproofing Outdoor Connectors.....................................................................................B-1 C Checking the Cable Circuit....................................................................................................C-1 D Cabling and Bundling............................................................................................................D-1 OptiX RTN 600 Radio Transmission System Installation Guide Contents Issue 03 (2008-08-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd iii D.1 Cabling..........................................................................................................................................................D-2 D.2 Bundling........................................................................................................................................................D-2 D.3 Bundling Fiber Jumpers................................................................................................................................D-3 E Engineering Labels for Indoor Cables..................................................................................E-1 E.1 Introduction to Labels....................................................................................................................................E-2 E.1.1 Labels for Power Cables........................................................................................................................E-2 E.1.2 Labels for Signal Cables........................................................................................................................E-2 E.2 Preparing Labels.............................................................................................................................................E-3 E.2.1 Printing Labels......................................................................................................................................E-3 E.2.2 Writing Labels.......................................................................................................................................E-4 E.3 Affixing Labels...............................................................................................................................................E-4 E.3.1 Affixing a Label to a Power Cable........................................................................................................E-4 E.3.2 Affixing a Label to a Signal Cable........................................................................................................E-5 E.4 Common Engineering Labels.........................................................................................................................E-6 E.4.1 Engineering Labels for Cabinet Power Cables......................................................................................E-6 E.4.2 Engineering Labels for Optical Fibers..................................................................................................E-7 E.4.3 Engineering Labels for Trunk Cables....................................................................................................E-9 E.4.4 Engineering Labels for IF Jumpers.....................................................................................................E-11 E.4.5 Engineering Labels for Network Cables.............................................................................................E-12 E.4.6 Engineering Labels for External Alarm Cables...................................................................................E-14 F Engineering Labels for Outdoor IF Cables...........................................................................F-1 F.1 Engineering Labels for IF Cables................................................................................................................... F-2 F.2 Binding the Labels for IF Cables....................................................................................................................F-2 G Glossary.....................................................................................................................................G-1 H Acronyms and Abbreviations...............................................................................................H-1 Index.................................................................................................................................................i-1 Contents OptiX RTN 600 Radio Transmission System Installation Guide iv Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd Issue 03 (2008-08-30) Figures Figure 1-1 Wearing an ESD wrist strap...............................................................................................................1-3 Figure 2-1 Straightening the tongue...................................................................................................................2-10 Figure 2-2 Removing the cover .........................................................................................................................2-10 Figure 2-3 Removing the surrounded wooden boards.......................................................................................2-11 Figure 2-4 Unpacking the carton........................................................................................................................2-12 Figure 2-5 Unpacking the boards.......................................................................................................................2-13 Figure 3-1 Appearance of the IDU 605 1A..........................................................................................................3-2 Figure 3-2 Appearance of the IDU 605 1B..........................................................................................................3-2 Figure 3-3 Appearance of the IDU 605 2B..........................................................................................................3-3 Figure 3-4 Installation holes of the IDU 605 chassis...........................................................................................3-3 Figure 3-5 Rack-mounting ears for the 19-inch cabinet.......................................................................................3-4 Figure 3-6 Rack-mounting ears for the ETSI cabinet of the IDU 605.................................................................3-5 Figure 3-7 Fastening the captive nuts...................................................................................................................3-6 Figure 3-8 Installing the rack-mounting ears for the ETSI cabinet......................................................................3-6 Figure 3-9 Fastening the chassis..........................................................................................................................3-7 Figure 3-10 Appearance of the IDU 605 after it is installed in the cabinet..........................................................3-7 Figure 3-11 Rack-mounting ears for the 19-inch cabinet.....................................................................................3-8 Figure 3-12 Installing the rack-mounting ears for the 19-inch cabinet of the IDU 605 (wall-mounting)...........3-8 Figure 3-13 Fastening the IDU 605 on the wall...................................................................................................3-9 Figure 3-14 Appearance of the IDU 605 after it is installed on the wall...........................................................3-10 Figure 3-15 Fixing the plastic feet on the bottom of the bracket.......................................................................3-11 Figure 3-16 Fastening the chassis onto the bracket............................................................................................3-11 Figure 3-17 Fastening the captive nuts...............................................................................................................3-12 Figure 3-18 Fastening the E1 panel ...................................................................................................................3-13 Figure 3-19 Appearance of the E1 panel after it is installed in the cabinet........................................................3-13 Figure 4-1 Installing the protection grounding cable...........................................................................................4-3 Figure 4-2 Installing the protection grounding cable of the E1 panel .................................................................4-4 Figure 4-3 Terminals of the power cable of the IDU 605....................................................................................4-6 Figure 4-4 Installing the power cable of the IDU 605..........................................................................................4-6 Figure 4-5 Installing the IF jumper of the IDU 605.............................................................................................4-7 Figure 4-6 Installing the E1 cable that is connected to the external equipment...................................................4-9 Figure 4-7 Installing the E1 cable that is connected to the E1 panel.................................................................4-10 Figure 4-8 Installing the network management cable........................................................................................4-12 OptiX RTN 600 Radio Transmission System Installation Guide Figures Issue 03 (2008-08-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd v Figure 4-9 Installing the orderwire line..............................................................................................................4-13 Figure 4-10 Making the external alarm cable according to the pin assignments...............................................4-14 Figure 4-11 Installing the external alarm cable..................................................................................................4-14 Figure 4-12 Make connectors synchronous data cable.......................................................................................4-15 uploads/s1/ installation-guide-v100r002-03.pdf

  • 38
  • 0
  • 0
Afficher les détails des licences
Licence et utilisation
Gratuit pour un usage personnel Attribution requise
Partager
  • Détails
  • Publié le Sep 17, 2021
  • Catégorie Administration
  • Langue French
  • Taille du fichier 9.9893MB